Published on: 14 November 2025

Construction output volume increased by 17.6% year-on-year and grew by 16.4% compared to the previous month

Construction output volume, based on raw data went up by 17.6%, and according to calendar-adjusted data was above the previous year’s low base by 15.2% in September 2025. Among the main construction groups the construction of buildings expanded by 18.3%, that of civil engineering increased by 17.1%. Based on seasonally and working day adjusted indices construction output was above the August 2025 level by 16.4%. Construction producer prices increased by 5.5% in the 3rd quarter of 2025 compared to the same period of the previous year.

In September 2025 compared to the same month of the previous year:

Output increased in both main groups of construction: in the construction of buildings by 18.3%, in civil engineering by 17.1%.

Among the divisions of construction, the construction of buildings expanded by 38.5%, civil engineering grew by 27.3% compared to the low base of the previous year. Production in specialised construction activities, having the largest weight in construction, increased by 2.7% year-on-year.

The volume of new contracts concluded was below the one year earlier level by 4.8%, within it the volume of contracts for the construction of buildings decreased by 4.1%, those for civil engineering works lessened by 5.3%.

The volume of the end-of-September stock of contracts at construction enterprises was 40.9% higher than one year earlier, within it the volume of contracts for the construction of buildings went down by 15.9% and grew by 75.0% for civil engineering works, compared to September 2024. A scheduled data revision has been carried out in September 2025, as a result, due to data revisions coming from data suppliers, the volume indices of the end-of month stock of contracts increased retroactively to January 2025.

In the first nine months of 2025 compared to the same period of the previous year:

Construction output volume grew by 1.7%.

Construction Producer Prices:

Within the divisions of construction prices went up in the 3rd quarter of 2025 in the highest degree(by 6.3%) in the greatest weight carrying specialized construction activities, the price rise was 5.0% in civil engineering and 4.6% in the construction of buildings compared to the 3rd quarter of 2024.

Construction prices were on average 0.7% higher than in the 2nd quarter of 2025.

Output of construction

Period Output of construction
volume indices value at current prices, billion HUF
unadjusted (raw) seasonally and working day adjusted
corresponding period of the previous year =100.0% 2021 = 100.0% previous month = 100.0%
2018121.382.180.6x3 321.3
2019120.499.199.1x4 381.6
202090.389.489.9x4 240.4
2021112.1100.099.0x5 330.6
2022101.6101.9102.2x6 779.8
202394.796.596.8x7 366.9
202498.895.396.4x7 699.5
2024January113.964.9105.7104.3436.8
February101.268.198.393.0452.9
March96.493.699.2100.9625.9
April114.086.999.5100.3574.7
May106.495.696.196.6636.1
June100.6100.397.5101.4672.8
July93.599.093.395.7663.6
August96.294.198.9106.0629.0
September90.3104.188.789.6699.1
October97.097.691.9103.6662.3
November96.0110.193.2101.5753.3
December95.0129.794.5101.4892.9
2025January93.160.497.8103.5428.1
February96.965.995.898.0462.3
March96.290.095.599.7635.4
April104.891.1103.1107.9636.5
May107.0102.2103.8100.7719.2
June102.4102.797.794.1729.0
July105.8104.798.6101.0741.1
August85.480.487.588.7566.8
September117.6122.4101.8116.4867.6
January-September101.791.198.0x5 785.9